Once Planning permission has been awarded the next stage of the project is to complete the structural engineering and building regulations drawings. Once these specifications, calculations and drawings have been completed building control approval can be applied for and a full tender process can be started.
If you would like to discuss your requirements or require building control drawings, please don't hesitate to contact us via the button below.
DAK Building Design
Copyright © 2024 DAK Building Design - All Rights Reserved.
Powered by GoDaddy